    Project

    Water Treatment Plant.

  • null

    Client

    TSK.

  • null

    Location

    KUWAIT, Shagaya.

  • null

    Sector

    Industrial – Water

  • null

    Service

    Engineering.

  • null

    Disciplines

    Process, electricity, mechanical and civil engineering, I&C and piping.

  • null

    Promoter

    KISR.

  • null

    Software

    Robot, Cype, Cadworx, Etap, Caneco.

  • null

    Year

    2017.

  • null

    Investment

    € 10 M

tsk
TSK, a leader in engineering developments and in the supply of top quality facilities, has once again entrusted IDEA with the engineering development for the project of the new WTA and WWTA Water Treatment Plants of the SHAGAYA 50 MW CONCENTRATED Thermoelectric Power Plant located 100 km west of the capital of Kuwait.

New Water Treatment Plant for TSK.

IDEA carries out the multidisciplinary detailed, process, mechanics, electricity and civil engineering, I&C and piping and provides technical support for the commissioning of the new water treatment plant in Kuwait. In collaboration with TSK to meet the needs of the KISR Promoter.

Developed works:

  • Technical documents: Basic Engineering and Detailed Engineering.
  • Quality control documents.
  • Construction and assembly documents.
  • SAT commissioning and FAT test documents.
  • Documents for training the maintenance and operations staff.
  • SIMATIC S7-400H SIEMENS PLC planning and SCADA displays.

We provide great value added to our projects thanks to the incorporation of BIM technology in the design phase as well as the cost control and planning of the construction model made by means of 4D and 5D technology.

Developed treatments:

  • WTA. Pre-Treatment Plant.
  • WTA. Demineralized wáter deging.
  • WTA. Reverse Osmosis Fist Step. RO.
  • WTA. Reverse Osmosis Second Setp RO.
  • WTA. Osmoted wáter tank.
  • WTA. RO Cleaning and flushing system.
  • WTA. Electrodeionization Modules. EDI.
  • WTA. RO EDI Performance Requirements.
  • WTA. RO EDI Alternatives.
  • WWTA. Description of the Wastewater Streams.
  • WWTA. Wastewater Collection and Equalization Subsystem.

The 10 million euro, project took one and a half yearsto complete the engineering, construction and testing stages. It will be commissioned in March 2018.

Using BIM tools, a 3D BIM Model, has been made, allowing for the manufacture of SKID and the pre-manufacture of piping and support in Spain to send and assemble on site. This has enabled us to obtain optimum timing results and once again to achieve our ‘ZERO ERROR’ target.

Contact us.
Do not hesitate to contact us by phone (+34) 917 034 404.
We will be happy to assist you.

Much more than engineering.

Digital Consulting, Engineering, Outsourcing and Architecture.
Contact us.
Do not hesitate to contact us by phone (+34) 917 034 404.
We will be happy to assist you.

Much more than engineering.

Digital Consulting, Engineering, Outsourcing and Architecture.