Mining Structure Snim CPI Copisa Industrial (Mauritania)
Project: Mining Structure Snim CPI Copisa Industrial
Client: CPI-COPISA INDUSTRIAL/SNIM
Location: Mauritania
Area: Industrial
Year: 2011
- Design, modeling and elaboration of information necessary for the manufacture and assembly of metallic structures,construction railings, tramex, enclosures and finishing touches for the expansion of an iron ore mine for Snim-Copisa in Mauritania.
- Design and calculation of the bolted joints of the entire structure. Realization of the standard of unions and design of special unions. Realization of approval plans with description and details of joints of the adopted solutions.
- Measurements, management and realization of purchase specifications.
- Preparation of approval plans with description and details of the selected solutions’ joints.
Structural steel 14,000 Tn.
Railings 13,000m.
Electro-welded grille 23,500 m<sup>2</sup>
Collaborating slab 6,600 m<sup>2</sup>