Project
Power Plant.
Client
Constructora San José.
Location
Spain, Burgos.
Sector
Industrial – Food.
Service
Engineering.
Disciplines
Mechanics, air conditioning, electricity and instrumentation.
Promoter
Campofrío.
Software
Cadworx, caneco, pipeflow.
Year
2017.
Investment
€ 225 M
New Campofrio Power Plant.
Development of the multidisciplinary engineering for the design of 99,000 m2 facilities, as well as technical support during the new factory’s construction process. Disciplines involved: mechanics, air conditioning, electricity and instrumentation.
Engineering works started in January 2016. Detailed engineering was developed in an initial four-month phase, optimising the design for quality assurance and safety of the facilities. During the construction phase, IDEA worked closely with our client to ensure the execution of the works until commissioning, which took place in March 2017.
IDEA has successfully developed design engineering for the 99.000 m2 facilities for Grupo San José, as well as providing technical support during the construction process of the new Campofrío factory.
Scope:
Fluids and Electricity installation for the New Campofrío Power Plant Project in Burgos, where the works listed below were carried out for the following facilities:
The detailed engineering works started in January 2016, optimising the design for quality assurance and safety of the facilities, and we worked closely with our client in the construction phase, to ensure its execution until commissioning in March 2017.
IDEA specialises in plants for the Agri-food sector and carries out optimised design tasks, ensuring top quality and maximum safety of our clients’ facilities at all times.